2nd stage of construction – soil excavation and GWT change

In this stage we perform the excavation step. To do so select the "Activity" mode and "excavate the soil" – the excavated region (the first layer from the left of the wall) is set as inactive. It is seen on the desktop that the built-in corrector of geometry automatically subdivided interfaces crossed by the wall into individual bounded regions.

2nd stage of construction – soil excavation

The "Water" input mode is then selected to enter the new ground water table.

2nd stage of construction – GTW change2nd stage of construction – GTW change

Next, switch to the "Analysis" mode and run the calculation of the 2nd stage.