Sheeting Check
|
|
Hydrostatic pressure, ground water behind and in front of structure |
The heel of a structure is sunk into impermeable subsoil so that the water flow below the structure is prevented. The loading due water is assumed both in front of and behind the structure. The water in front of structure is removed either with the help of gravity effects or is shallowly lowered by pumping. Both the face and back of structure is loaded by hydrostatic pressure due to difference in water tables (h1 and h2). The dimension hw represents the difference in water tables at the back and in front of structure - see figure:
Action of hydrostatic pressure
Language: english
Company Fine develops structural engineering software with main focus on geotechnical software and structural engineering analyses.
A Fine építőmérnöki szoftvereket fejleszt, elsősorban statikai és geotechnikai programokat.
Společnost Fine se zabývá vývojem stavebního software, zejména programů na statické výpočty, zakládání staveb a geotechniku.
Η εταιρεία Fine αναπτύσσει λογισμικό για πολιτικούς μηχανικούς και ειδικά για γεωτεχνικά θέματα και δομοστατικά θέματα.
Компания Fine занимается разработкой строительного программного обеспечения, особенно программ для расчета статики и геотехнических программ.
شرکت Fine توسعه دهنده نرم افزار های مهندسی عمران با نگاه ویژه به نرم افزار های ژئوتکنیک و تحلیل های سازه ای مهندسی می باشد.
Fine es una compañía que desarrolla y suministra programas de ingeniería civil especializada en programas geotécnicos y de estructuras.
Fine je Češko podužeće koje razvija i dobavlja konstrukcijske i geotehničke programe. Trenutno tvrtka nudi više od 50 pojedinačnih programa za rješavanje zadataka za statiku, dizajn konstrukcija, temeljenja i geotehnike.