Graphs to Calculate Settlement
Graphs to calculate settlement are taken from the NEN6743 standard (article 6.2.1), which allow us to determine:
- Pile settlement due to base vertical force (pile settlement in percentage of the equivalent pile diameter plotted as a function of the base vertical force given in percentage of the maximum base resistance Fmax,base).
- Pile settlement due to shaft force (pile settlement in mm plotted as a function of the shaft force given in percentage of the maximum shaft resistance Fmax,shaft).
Graph to determine wbase,d,1 (1 - driven piles, 2 - continuous auger, 3 - bored piles)
Graph to determine wbase,d,2 (1 - driven piles, 2 - continuous auger, 3 - bored piles)