The link was sent to your email.

We were unable send the link to your email. Please check your email.

Missing captcha code. Please check whether your browser is not blocking reCAPTCHA.

Invalid captcha code. Please try again.

Online Help

GEO5

Tree
Settings
Product:
Program:
Language:

Graphs to Calculate Settlement

Graphs to calculate settlement are taken from the NEN6743 standard (article 6.2.1), which allow us to determine:

  • Pile settlement due to base vertical force (pile settlement in percentage of the equivalent pile diameter plotted as a function of the base vertical force given in percentage of the maximum base resistance Fmax,base).
  • Pile settlement due to shaft force (pile settlement in mm plotted as a function of the shaft force given in percentage of the maximum shaft resistance Fmax,shaft).

Graph to determine wbase,d,1 (1 - driven piles, 2 - continuous auger, 3 - bored piles)

Graph to determine wbase,d,2 (1 - driven piles, 2 - continuous auger, 3 - bored piles)

Try GEO5 software yourself.
Download Free Demoversion.