The link was sent to your email.

We were unable send the link to your email. Please check your email.

Missing captcha code. Please check whether your browser is not blocking reCAPTCHA.

Invalid captcha code. Please try again.

GEO5 Software

Online Help

Tree
Settings
Program:
Language:

Triangle Method

Settlement of terrain behind the shoring structure is calculated according to the following formula in case of triangle method:

where:

δmax

-

maximum settlement

sw

-

area formed by the deformed structure and un-deformed structure

x0

-

range of settlement

The range of terrain settlement x0 is defined as follows:

where:

H

-

depth of excavation

D

-

length of the structure below the bottom of foundation pit

φ

-

weighted average internal friction angle of all soil layers that the structure goes through

Try GEO5 software for free.