Internal Stability
The frame allows for the verification of internal stability of a structure assuming either plane or broken slip surface.
The verification of internal stability is performed:
- According to EN 1997 (the actual verification is performed according to the theory of limit states).
- According to LRFD (the actual verification is performed according to the theory of limit states).
- Verification according to the factor of safety or the theory of limit states (verification is performed depending on the setting in the "Stability analysis" tab)
Individual steps of the verification procedure are described herein.
The "Ignore the last row of nails" option allows verification of a temporary stage in which the slope has already been excavated, but the bottom row of nails has not yet been installed. In this case, this row is excluded from the internal stability analysis.
Frame "Internal stability"