The link was sent to your email.

We were unable send the link to your email. Please check your email.

Online Help

GEO5

Tree
Settings
Product:
Program:
Language:

Verification According to the Safety Factor

The verification analysis according to factor of safety is selected in the "Pile CPT" tab. This frame also allows to define the required factor of safety for bearing capacity. Pile verification then assumes the form:

where:

Fs,d

-

pile load

SFb

-

safety factor for bearing capacity

Fr,d

-

pile bearing capacity

Try GEO5 software yourself.
For free, without analysis restrictions.