The link was sent to your email.

We were unable send the link to your email. Please check your email.

Missing captcha code. Please check whether your browser is not blocking reCAPTCHA.

Invalid captcha code. Please try again.

GEO5 Software

Online Help

Tree
Settings
Program:
Language:

Index Method

Settlement of terrain behind the shoring structure is calculated according to the following formula in case of index method:

where:

δmax

-

maximum settlement

sw

-

area formed by the deformed structure and un-deformed structure

x0

-

range of settlement

δ(x)

-

settlement at each point within the range of settlement x0 in distance x

x

-

distance between the calculation point and the edge of the foundation pit

Note: Calculation method for the range of settlement x0 is as same as in case of triangle method.

Try GEO5 software for free.