The link was sent to your email.

We were unable send the link to your email. Please check your email.

Missing captcha code. Please check whether your browser is not blocking reCAPTCHA.

Invalid captcha code. Please try again.

Online Help

GEO5

Tree
Settings
Product:
Program:
Language:

DG/TJ08-61-2010

Settlement of terrain behind the shoring structure is calculated according to the DG/TJ08-61-2010 (Technical code for excavation engineering in Shanghai) and it is suitable for using in soft soils.

Settlement behind the sheeting differs in two parts - main influence area and secondary influenced area.

Maximum settlement δmax is calculated as follows:

where:

δmax

-

maximum settlement

δhm

-

maximum horizontal displacement of structure

The range of settlement x0 is calculated as follows:

where:

x0

-

range of settlement

H

-

depth of excavation

Settlement at each point δ(x) in range of settlement x0 is calculated as follows:

where:

δ(x)

-

Settlement at each point within the range of settlement or influenced area

x

-

Distance between the calculation point and the edge of the foundation pit

Literature:

DG/TJ08-61-2010 (Technical code for excavation engineering in Shanghai)

Try GEO5 software yourself.
Download Free Demoversion.